MORGANBUILD

Project List

Tooting High Street

Conversion of  shop, upper parts and basement to 3 flats

Manor Crescent, Surbiton

Loft conversion, rear bedroom extended with new vaulted roof, new roof to existing kitchen

Sheen Gate Gardens, East Sheen

Single storey rear extension with spiral wine cellar

Sheen Gate Gardens, East Sheen

Large 2 storey rear extension

Haywards Heath, Sussex

Single storey vaulted extension added to existing kitchen that had substantial refurbishment.

Tooting High Street

Constructing a new flat on top of an existing double extension

Richmond, Surrey

Constructing a new church hall

Anchor 2

Tooting High Street
Conversion to 3 Flats

Original facade

tooting refurbishment
drone shot of tooting extension

Aerial view of rear - initial strip out using the rubbish chute.

Extension half built

Finished project

Works in progress - nearly all of the original back wall was taken out floor by floor and the only thing left internally was the staircase. The original roof structure was kept but modified.

demolition undergoing, exterior brickwork and steelwork
finished bathroom at tooting
finished kitchen and living area in tooting
finihsed bathroom in tooting
finished hallway with megaflow and boiler
veiw of finished studio kitchen in tooting
finished living room in tooting

Finished frontage leaving existing shop sign

front finished facade in tooting highstreet
Anchor 3

Manor Crescent, Surbiton

Loft conversion, rearrangement of first floor and new roof to kitchen

Existing rear view

before shot, Surbiton, Surrey
drone shot, before rear extension - Surbition, Surrey
Scaffolding erected at Surbiton,Surrey

Existing roof taken off kitchen

New roof over kitchen started

New roof over exsiting kitchen
New roof over kitchen extension

Forming roof over bedroom extension

New kitchen rafters

New loft floor, ceiling and purlin supports

Loft Dormer formed, bedroom extension roof tiled

New staircase to loft

Bedroom extension feature window

new staircase leading up to loft extension
kitchen electric veluxes, new zinc roof on kitchen extension

Kitchen electric rooflights, zinc roofing and completed loft 

master bedroom feture window

Master Bedroom feature window

Master bedroom showing door to en-suite and wardrobes

Master bedroom en-suite

2017-09-27 14.43.38.jpg

Loft bedroom front slope

Loft bedroom dormer at rear

drone shot of finished extension

Finished extension - just needs painting. BTW we're doing the contract next door as well

FINISHED

finished rear shot
Anchor 4
Sheen Gate Gardens , East Sheen

Before we started

Original kitchen

Digger had to go through house - very tight

Old kitchen nearly demolished

Setting out

Footings excavated

Footings concreted

Outer skin of brickwork to dpc and steel columns being bolted to foundations

Starting excavation of spiral wine cellar. After first former is in place, excavated down 900mm, new former bolted on top of first and then both formers dropped the excavated 900mm. Repeated until depth of 3m achieved.

Down to depth

Floor slab sub base ready

Floor slab reinforcement going in.

Finished slab - except round wine cellar.

Main cranked beam installed

Roof structure being installed

View towards garden end

Nearly ready for roof covering.

Specialists starting to install spiral wine cellar.

Finished - including electrically operated trapdoor.

Zinc roof specialists installing Veluxes.

Flat roof covering done = hot bitumen laid.

All roofing & skylights completed

Folding sliding doors installed. White pipes in foreground are vent pipes for the wine cellar.

Underfloor heating pipes installed

Pipes are laid to avoid kitchen units, vent pipes etc.

Screeding done

Plastering being done.

Kichen fitting starting - all £90k of it !

Sub Zero American fridge, Double Gaggenau ovens

Here are a selection of professional photographs the client commissioned

The following is a selection of more modest lived-in finished photos

Anchor 5

Sheen Gate Gardens, East Sheen

Existing extension demolished by others. We also completely refurbished the whole top floor including the roof - not shown here'

Foundation trench dug

Foundation footing concreted

Starting brickwork

Walls going up

Steelwork going up

Flat roof at rear being installed

Skeiling formed on one side of roof

View from inside the house towards rear

Back wall of house at first floor level taken out and steels installed.

Mezzanine roof steels installed

Mezzanine roof structure

Roof insulation fitted, gutters formed

Meanwhile downstairs, ready for concrete slab

Including whole of the existing house

Concrete poured

Meanwhile back on top, zinc roof over main kitchen area installed

As well as mezzanine roof

Blockwork forming bedroom rear wall, mezzanine windows & lower glass roof.

Zinc fascia nearly done

Ready for lower glass roof

Mezzanine windows fitted

Kitchen bi-folds in, plastering started

Underfloor heating looking towards rear

Underfloor heating looking towards front lounge (now blocked off) with WC partition now in place

All plastered, kitchen units going in.

Looking towards front

Staircase up to mezzanine fitted

Finished outside view

View down the side

Rear aerial view

Side aerial view

Anchor 6

The Rosary Barn, Haywards Heath

Looking from kitchen to garden

The existing AGA that gets refurbished, front door is just visible in the far right

Old kitchen taken out

Old conservatory demolished, strongboy props in place ready to take out wall.

Taking out one of the existing old barn walls

Getting a foundation pad ready for a new oak support column.

Back wall taken out, footings dug but the ground was so bad it had to be shuttered.

The drainage needed to be bridged so the foundations were stopped short on the left, right and top.

Concreted and shuttering removed

Installing soakaway

Steels were placed on the foundation ends, bolted together, wrapped in thin mesh then shuttering formed round it.

Brickwork to DPC laid, pad concreted and steel installed.

Brickwork done, steelwork being installed.

Roof rafters being installed.

Raw green oak Structural supports in place

New green oak entrance porch at opposite end of kitchen. Crane is trying to squeeze through gap between buildings.

Crane needed to lift 1.5 tonne of solid oak into place - the oak is purely ornamental, the conservation people thought it would look nice - which it does.

There was existing underfloor heating in the old kitchen....

Which we extended into the new extension. Screeding started.

Folding sliding doors in, just waiting for windows above to be finished.

New enclosure for Aga - with orange glass splashback & reclaimed oak faux beam.

Getting down to the finishes

Looking towards front door.

Kitchen being fitted.

Finished photos

Still a bit of unpacking to do

Partitioned off some of the utility room, formed a new doorway by the front door and fitted a WC

A few photos of the lounge in the barn next to the kitchen - fabulous room but was already finished before we started !

Anchor 7

106-108 Tooting High Street

Old roof structure removed, forming new entrance to common parts.

Sound reducing quilt and T&G flooring laid on top of existing ceiling rafters.

Steel deck installed above existing ceiling.

Cranked on one side

Street side is built up square.

Joists fitted with Fireline board between.

T&G flooring laid on deck with more sound reducing quilt underneath.

External timber frame walls being buit.

This side will have a sloping tiled roof.

First of the roof columns & steels being installed. On the floor you'll see a layer of soundproof mat, then a layer of Fireline board then another layer of T&G flooring !

First half of the main roof ridge beam in place.

The other half now in place.

Roofing started.

Outer brick skin being built

Side roof being prepared.

Forming a small patio just outside kitchen area.

GRP done with antislip particles in floor surface.

Plasterboard & plastering in progress.

Engineered oak flooring being installed.

Finished works

Boiler cupboard is by flat door.

Bathroom is down the hallway on the left, Bedroom on the right.

Anchor 8

New Church Hall, Richmond, Surrey

Built in 1993 behind Church of our Lady Queen of Peace

Church Hall 02.jpg

Original church hall

Demolished !

Pouring the rear foundations

Foundations complete

Drainage & brickwork to dpc being done

Concrete pad being prepared

Concrete pad being poured

Walls going up

Walls nearly finished

Reinforced ring beam being concreted

Roof steels being installed

Roof structure being installed

Roof insulation, Veluxes fitted, tower built

Monsignors office being built at one end

Toilets, canteen and gallery built at entrance end

View from gallery

Gents toilet being fitted out

Ladies toilet being fitted out

Staircase to gallery

Rear of the building with the tower at the end

Finished project looking towards gallery, canteen & toilets

Looking the other way towards upstairs office